Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Delta Driveway & Pavers: The Pomona Owner’s Guide
We stock and install Delta-compatible driveway and paver components in Pomona, with most replacement jobs running $5,000-$14,000 for full driveway replacement and $250-$700 for sealing work, depending on square footage and substrate condition. Most Delta paver resets and joint-sand replacements are completed in a single day once materials are on-site. Homeowners usually notice the problem first as shifting or sinking after rain, or as weeds pushing through joints that used to stay tight - signs that the bedding layer or edge restraint has given way.
Which Delta Models This Applies To
Delta’s hardscape line covers several series, and the part you need depends on when your driveway or patio was installed. The Delta Classic series, common in Pomona installations from 2012 to 2019, uses a 60mm paver with a proprietary edge restraint clip that differs from the later Delta Pro series, which switched to a universal aluminum L-channel in 2020. If your pavers are lifting at the perimeter, check the stamp on the underside - Classic clips are ABS plastic with a Delta “C” mark; Pro series carry a “P” and a date code.
We carry both OEM Delta edge restraints and a Grade-6061 aluminum aftermarket equivalent that meets the same flexural spec at roughly 30% less cost. The aftermarket piece won’t match the Delta stamp, which matters for some HOA documentation in Pomona’s historic districts near downtown. Measure twice, then we can talk.
Grant Rowan and our crew have handled enough Delta resets across Pomona to spot the Classic-vs-Pro distinction before the truck is unloaded. Bring a photo of the paver stamp and the approximate square footage - we’ll match the part before we arrive.
Signs Your Delta Driveway & Pavers Is Failing

- Sinking or dipping in traffic paths. The bedding layer beneath the pavers has washed out or compacted unevenly, usually from water intrusion through failed joint sand. In Pomona, where clay-heavy soil expands and contracts with winter rains, this accelerates after the third or fourth season without maintenance.
- Weeds growing between joints. The polymeric sand has degraded to the point that it’s no longer locking the pavers. Once organic matter fills the gap, roots lever the pavers apart during growth cycles.
- Pavers rocking underfoot. Individual units have lost contact with the bedding layer, often because the base was under-compacted during original install or because tree roots have displaced the substrate. Rocking pavers chip at the edges and create trip hazards.
- Edge pavers tilting outward. The edge restraint has pulled free from its spikes or rotted, if wood was used. Delta Classic plastic clips become brittle after seven to ten years of UV exposure in Southern California.
- Standing water after light rain. The pitch has reversed due to base settlement, or joint sand loss has created channels that trap water. Pooling accelerates bedding layer failure and can undermine the entire field if left unaddressed.
Before
AfterReplacement Cost & What’s Included
| Service | Price Range in Pomona | What’s Included |
|---|---|---|
| Driveway Sealing (maintenance) | $250-$700 | Pressure wash, joint sand top-off, solvent-based or water-based sealer application per spec |
| Paver Reset & Re-sand (partial) | $1,500-$4,500 | Lift affected area, re-compact base, replace bedding sand, re-lay pavers, polymeric sand, seal |
| Full Driveway Replacement | $5,000-$14,000 | Remove and dispose, grade and compact base, install bedding layer, lay pavers, joint sand, edge restraint, initial seal |
| New Paver Driveway Installation | $7,000-$18,000 | Full scope with expanded material options (Belgard, Techo-Bloc, or Delta-equivalent) |
What drives the range: square footage, access for equipment, whether the existing base can be salvaged, and whether your HOA or personal preference requires OEM Delta materials versus compatible alternatives. Under Clause 1 of The Haven Standard, the price we write is the price you pay - no change order gets signed unless you initiate it, and no work starts before that written number is in your hands.
Every paver job carries our 365-Day Done Right Promise: if the joints open, the edge lifts, or the pitch reverses, we return and make it right. The photo record from your job, delivered as standard, documents the base depth and compaction passes so there’s no dispute about what was done.
DIY or Call Us?

There’s honest work a homeowner can do: sweep in fresh polymeric sand after a thorough pressure wash, or reset a few edge pavers if the base underneath is still sound. You’ll need a rubber mallet, a push broom, and a free afternoon. The sealer application is straightforward if you follow the manufacturer’s cure-time rules.
Where DIY goes wrong: re-compacting the base layer requires a plate compactor and an understanding of lift thickness - too thick a layer and the compaction is uneven, which shows up as dips within two seasons. Edge restraint replacement involves cutting and staking metal or plastic channels to grade, which is tedious and easy to misalign. And if your driveway serves as the approach to a garage with a heavy vehicle, the base spec changes - most homeowners don’t own the compaction equipment or the gauge to verify it.
We’re not affiliated with Delta; we’re an independent service provider with sourcing relationships across fifty-plus brands including Delta, Belgard, and Techo-Bloc. If you’re unsure whether the base is salvageable, call (626) 606-1081 and we’ll schedule a free estimate with a written scope and price before any work starts.
FAQs
Delta concrete pavers last 25 to 30 years in Pomona when installed on a properly compacted base with maintained joint sand. The weak point is usually the edge restraint or the bedding layer, not the paver itself, which is why we see resets at year 12 to 15 rather than full replacements. Call (626) 606-1081 for an exact quote on your reset - estimates are free.
Yes, if the base is intact and fewer than 20% of pavers are affected. A partial reset lifts the damaged section, re-compacts the base, and re-lays the same pavers with fresh joint sand. If the base has washed out across more than a third of the area, full replacement is more cost-effective than repeated partial repairs. Call (626) 606-1081 for an exact quote - estimates are free.
A typical residential driveway reset of 400 to 600 square feet takes one to two days, including base prep, re-lay, joint sand curing, and sealer application. Larger driveways or those with tight access may run to three days. We don’t promise same-day completion on planned hardscape work - the base compaction and joint sand cure times are physical constraints, not scheduling choices. Call (626) 606-1081 to schedule your free estimate.
We stock common Delta-compatible edge restraints, polymeric sands in tan and gray, and sealers for same-day starts on maintenance and reset jobs. Specific paver colors and textures are ordered to match your existing field, which typically takes two to three business days in the Pomona area. Call (626) 606-1081 to confirm availability for your model and color - estimates are free.
Written by Grant Rowan, Owner, Rowan Construction Group Pomona at Rowan Construction Group Pomona, serving Pomona and nearby areas.







Before
After
Before
After
Before
After