Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Oldcastle Driveway & Pavers: The Pomona Owner’s Guide
We stock and install Oldcastle-compatible driveway and paver systems in Pomona, with paver driveway installations typically running $7,000-$18,000 and concrete driveway work at $4,500-$12,000 depending on substrate condition and square footage. Most Pomona homeowners discover their Oldcastle surface is failing when individual pavers start rocking underfoot, joints wash out after winter rains, or the bedding layer settles unevenly near downspout outlets - usually 8 to 15 years after original installation, sooner if the base wasn’t compacted to 95% standard Proctor density. We carry replacement pavers, edge restraints, and polymeric sand on our trucks, and we can match most Oldcastle color runs from current stock.
Which Oldcastle Models This Applies To
Oldcastle sells through multiple retail channels in Southern California, so the same paver shape often carries different SKUs at Lowe’s, Home Depot, and specialty yards. Look for the manufacturing date stamp on the paver edge - usually a four-digit code in a recessed rectangle - and note the thickness: 60mm (2.36″) for residential driveways, 80mm (3.15″) for commercial or heavy-vehicle applications. The popular Oldcastle Countryside, Coastal, and Holland series all share the same 4″ × 8″ × 2.36″ footprint but differ in surface texture and bevel edge. We don’t source from Oldcastle directly - Rowan Construction Group Pomona is an independent contractor - which means we can quote equivalent or upgraded Belgard and Techo-Bloc units when the original Oldcastle color run has been discontinued. That’s common with the tan-and-charcoal blends sold around Pomona in the 2012-2018 building wave. Bring us a sample paver or clear photos with a tape measure in frame; we’ll cross-reference the spec sheet and confirm fit before we quote.
Signs Your Oldcastle Driveway & Pavers Is Failing

- Individual pavers rock or wobble underfoot. This means the bedding sand has eroded or the base layer has settled unevenly. In Pomona’s clay-heavy soils, especially north of the 10 Freeway near Phillips Ranch, seasonal expansion and contraction gradually pump fines out through the joints.
- Joint sand washes out after rain, leaving gaps. The original polymeric sand has degraded or was never properly activated with water during installation. Once the joint is open, water penetrates to the base and accelerates settlement.
- Edge pavers tilt outward or the soldier course separates from the field. The plastic or aluminum edge restraint has cracked from UV exposure or was installed with inadequate spike depth. Oldcastle systems installed before 2015 often used PVC edge restraints that become brittle in our inland heat.
- Surface staining that doesn’t clean with pressure washing. Oil migration from the base or efflorescence rising through the paver body indicates moisture trapped below the surface, usually from a failed vapor barrier or insufficient drainage slope.
- Sunken areas near garage thresholds or downspout outlets. Concentrated water flow has undermined the aggregate base. This is the most common call we get in Pomona’s older neighborhoods, where original downspouts discharge directly onto the driveway surface.
Before
AfterReplacement Cost & What’s Included
| Scope | Price Range in Pomona |
|---|---|
| Partial paver replacement (up to 100 sq ft, localized failure) | $1,200-$3,500 |
| Full paver driveway replacement (standard 2-car, ~600 sq ft) | $7,000-$18,000 |
| Concrete driveway replacement | $4,500-$12,000 |
| Base repair and re-leveling only (no new pavers) | $800-$2,200 |
| Joint sand refresh with polymeric stabilization | $250-$700 |
The spread in paver pricing comes down to three things: how much base material we need to remove and recompact, whether the original color run is still available or requires a close match, and whether we need to regrade for drainage. Our quotes itemize each line - demolition, base prep, bedding layer, pavers, edge restraint, joint sand, disposal - so you see where the money goes. Under Clause 1 of the Haven Standard, that written price is fixed; no change proceeds without a signed change order. Every paver job carries our 365-Day Done Right Promise, and you get a documented photo record of the excavation, base compaction test, and finished surface.
DIY or Call Us?

There’s a safe middle ground here. A homeowner can check whether a rocking paver sits on a void by sounding it with a rubber mallet - a hollow ring means the bedding sand is gone. You can also verify drainage slope with a 4-foot level and a shim; water should run away from the garage at 1/8″ per foot minimum. But once you’re lifting pavers, the work goes wrong fast. The base layer must be recompacted in 6″ lifts with a plate compactor rated for the soil type; hand-tamping won’t achieve the 95% density that prevents future settlement. And if your driveway butts up against a garage slab or foundation, improper grading can direct water toward the structure. We’ve fixed three Pomona jobs this year where the DIY phase went fine and the water intrusion phase went expensive. Measure twice, then we can talk. Call (626) 606-1081 and we’ll review what you’ve found - estimates are free, and we’ll tell you honestly if it’s a half-day fix or a full replacement.
FAQs
Properly installed Oldcastle pavers on a compacted aggregate base last 20 to 30 years in Pomona’s inland climate, though the surface color fades noticeably after 10 to 12 years of UV exposure. Joint sand and edge restraints typically need attention at the 8- to 12-year mark. Call (626) 606-1081 for an exact quote on refresh work - estimates are free.
Localized failures - a few settled pavers, a washed-out joint, a cracked edge restraint - can be repaired if the base is still sound and the original pavers are available. If the failure pattern repeats across more than 15% of the surface, or if the base has been wet for an extended period, partial repairs usually fail within two years. We assess this on every call and quote both options when both make sense.
A localized repair of 50 to 100 square feet takes one to two days, including base prep and cure time for the polymeric sand. A full driveway replacement runs four to six days depending on square footage and whether we need to adjust drainage. We don’t promise same-day completion on planned construction; the base compaction and bedding layer need proper curing intervals or the job fails early.
We stock common 60mm and 80mm paver sizes, edge restraints, and polymeric sand; specific Oldcastle color runs we source from regional yards with next-day availability for most standard blends. If your original color has been discontinued - common with the 2012-2016 production batches - we’ll bring sample boards for a close match before ordering. Bring a sample paver or photos with measurements to speed the match.
Written by Grant Rowan, Owner, Rowan Construction Group Pomona at Rowan Construction Group Pomona, serving Pomona and nearby areas.







Before
After
Before
After
Before
After