Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cambria Home Additions & ADU: The Pomona Owner’s Guide
We stock and install Cambria-compatible surfaces for home additions and ADU projects across Pomona, with typical installed pricing from $45,000 to $130,000 for full additions and $90,000 to $220,000 for detached ADUs. Most Cambria slab selections can be templated and fabricated within standard project timelines. If your existing Cambria surface has cracked, delaminated, or failed at a seam in your addition or granny flat, the fix usually involves slab replacement rather than spot repair, given Cambria’s engineered-quartz composition.
Most Pomona homeowners discover the problem during a seasonal inspection, or when a tenant in the ADU points out a crack spreading from a cooktop cutout or a seam lifting near the bathroom vanity. The combination of inland-heat cycling and the structural settling common in older Pomona neighborhoods, especially north of the 10 Freeway near Lincoln Park and the Ganesha Hills area, puts repeated stress on rigid surfaces.
Which Cambria Models This Applies To
Cambria’s engineered-quartz slabs are not model-specific the way appliances are, but they are batch-specific and colorway-dependent. The critical identifier is the slab lot number, printed on the original invoice or etched on the slab edge at fabrication. If you’re matching an existing surface in a Pomona addition or ADU, we need that lot number, not just the color name. “Brittanicca” from 2019 and “Brittanicca” from 2023 can carry visibly different veining and base tones because Cambria adjusts its resin-to-pigment ratios over production runs.
We work with both Cambria-certified fabricators for OEM-matched replacement and vetted independent shops for quality aftermarket equivalents when the original lot is discontinued. The aftermarket route saves roughly 15-25% on material but requires a sample approval step, because non-certified fabricators use different resin systems that can shift color under Pomona’s UV exposure. For ADU rentals where tenant turnover means wear is accelerated, we often spec a denser, commercial-grade equivalent from Silestone or a comparable brand, depending on the owner’s hold period.
Signs Your Cambria Home Additions & ADU Is Failing

- Hairline cracks radiating from sink or cooktop cutouts. These start at stress concentrators where the slab was field-cut. In Pomona’s climate, thermal expansion pulls the quartz away from the substrate; the crack widens each summer until water reaches the plywood below.
- Seam separation or lipping at joints. The epoxy bond fails when the cabinets beneath shift, which happens more in additions built on post-tension slabs or older pier foundations common in the Mayfair and Westmont neighborhoods.
- Surface dulling or etching that doesn’t clean off. Cambria is non-porous, so true staining is rare. Dulling usually means the resin top layer has degraded from prolonged heat exposure, often from a portable induction cooktop placed directly on the surface in an ADU kitchen.
- Discoloration around the perimeter where slab meets backsplash. This indicates moisture migration from an unsealed sink deck or failed caulk line. In Pomona’s dry season, the moisture evaporates and leaves mineral deposits; in winter, it wicks into drywall.
- Hollow sound when tapping the surface. The adhesive bond between slab and substrate has failed, creating a void. This progresses to cracking under load and is especially common in garage conversions where the original slab wasn’t leveled for finished use.
Before
AfterReplacement Cost & What’s Included
| Project Type | Typical Range in Pomona | What’s Included |
|---|---|---|
| Home Addition (full build) | $45,000 - $130,000 | Framing, MEP rough-in, finishes, Cambria or equivalent surfaces |
| ADU Construction (detached) | $90,000 - $220,000 | Foundation to finish, permit coordination, utility tie-ins |
| Garage Conversion to ADU | $30,000 - $80,000 | Slab prep, insulation, kitchen/bath rough-in, surfaces |
| Cambria Slab Replacement Only | $2,000 - $6,500 | Removal, substrate inspection, new template, fabrication, install |
The spread on slab replacement comes down to three factors: whether we can match the existing lot, how much cabinetry needs disconnection, and what the substrate condition reveals once the old surface is off. We quote the full number before demolition starts. Under Clause 1 of the Haven Standard, that written price includes the slab, fabrication, installation, and a one-year workmanship warranty. If we find rotted substructure or out-of-level cabinets, we document it with photos and write a change order before any additional work proceeds. No surprises.
Rowan Construction Group Pomona is an independent contractor and not affiliated with Cambria. We source through Cambria’s certified fabricator network and through our own vetted suppliers, whichever gets the homeowner the matched surface at an honest number.
DIY or Call Us?

There’s a short list of things a homeowner can safely check: confirm the crack hasn’t reached the substrate by tapping for hollow spots, photograph the lot number if it’s visible, and measure the affected area for rough material calculation. What you should not attempt is slab removal or reinstallation. Cambria slabs run 2-3 cm thick and weigh roughly 20 pounds per square foot. A standard kitchen island section can exceed 400 pounds, and the adhesive release requires heat guns and specialized suction equipment. We’ve seen hairline cracks become full fractures when a homeowner pried with a putty knife.
Also, Cambria’s warranty is fabricator-dependent; unlicensed removal voids any remaining coverage. If your addition or ADU is a rental, the liability exposure from tenant injury on a failed surface isn’t worth the savings. Call (626) 606-1081 and we’ll template, quote, and schedule. Measure twice, then we can talk.
FAQs
Properly installed Cambria surfaces last 20-30 years in residential use, though ADU kitchens with tenant turnover often see functional wear at 12-15 years. Call (626) 606-1081 for an exact quote on replacement - estimates are free.
Surface chips and minor edge damage can be filled with color-matched epoxy, but cracks through the body of the slab are not repairable in a structural sense. The thermal expansion cycle in Pomona’s inland climate will reopen any bonded crack within one to two seasons. Call (626) 606-1081 for an exact quote on replacement - estimates are free.
Template to install is typically 10-14 business days: one day to template and remove, 7-10 days for fabrication, and one day to install. We coordinate this within the broader addition or ADU schedule so you’re not living around multiple trades. Call (626) 606-1081 for an exact quote - estimates are free.
We don’t stock full slabs because color matching requires lot-specific sourcing, but we maintain relationships with regional Cambria distributors in Ontario and Anaheim that carry current colorways. Discontinued colors require a sample submission and custom run, which adds 3-4 weeks. Call (626) 606-1081 for an exact quote - estimates are free.
Ready to get your Pomona addition or ADU surface sorted? Call (626) 606-1081 to schedule your free estimate. We’ll bring samples, take measurements, and leave you with a written price before anyone picks up a tool.
Written by Grant Rowan, Owner, Rowan Construction Group Pomona at Rowan Construction Group Pomona, serving Pomona and nearby areas.







Before
After
Before
After
Before
After