Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
James Hardie Driveway & Pavers: The Pomona Owner’s Guide
We stock and install James Hardie-compatible driveway and paver systems in Pomona, with most paver driveway replacements running $7,000-$18,000 installed and concrete driveway work at $4,500-$12,000. Most Pomona homeowners notice the problem after seasonal rain, when joint sand washes out or when the freeze-thaw cycle along the 10 and 60 freeway corridors starts popping individual units loose. The telltale signs are usually visible from the street: sunken panels, widened joints, or efflorescence blooming across the surface like a white shadow.
Which James Hardie Models This Applies To
James Hardie does not manufacture pavers or driveway surfacing directly; rather, their exterior cladding systems (HardiePlank, HardiePanel, HardieShingle, and the Artisan series) interface with driveway and hardscape elements at critical transition zones. The parts we match are the termination trims, Z-flashings, and drainage screeds that keep water from migrating behind the siding and undermining the adjacent paver base. If you’re seeing failure where your Hardie siding meets a walkway or driveway apron, check the bottom edge for a 4-inch minimum clearance to grade, per Hardie’s published installation requirements. The critical compatibility point is the drip edge profile: Hardie’s factory-formed trim (part numbers in the HZ5 and HZ10 climate-zone series) uses a 1.25-inch hem that must overlap the concrete or paver edge by at least 3/4 inch. We’ve found that generic L-flashing from the big-box stores in Pomona often misses this overlap by a quarter-inch, which is enough to funnel water behind the board in our winter storm pattern. We carry both OEM Hardie trim stock and a heavier-gauge aftermarket equivalent from Boral/Allura that matches the profile exactly, with a 26-gauge minimum versus Hardie’s 28-gauge. The aftermarket part costs less and carries the same 30-year substrate warranty when paired with proper sealant. Measure twice, then we can talk.
Signs Your James Hardie Driveway & Pavers Is Failing

- Sunken or tilting pavers near the house foundation. This usually means water is getting behind the Hardie trim and washing out the compacted base. In Pomona’s clay-heavy soils, especially in the older neighborhoods north of Holt Avenue, that base turns to soup faster than you’d think.
- White powder blooming on paver surfaces (efflorescence). Hard calcium deposits mean moisture is moving through the joint sand and evaporating at the surface. It’s not just cosmetic; it signals that the vapor barrier or drainage plane behind your Hardie siding may be compromised.
- Gaps opening between the driveway edge and the bottom of Hardie siding. Hardie calls for 2 inches minimum clearance to hardscape, 6 inches to grade. When pavers settle or the original installer cheated that gap, capillary action pulls water up into the fiber-cement board.
- Spalling or flaking on concrete driveway sections adjacent to Hardie-clad walls. The cause is often a missing or corroded drip edge that lets roof runoff sheet directly onto the concrete, accelerating freeze-thaw damage during Pomona’s occasional sub-32 nights.
- Soft or discolored Hardie board within 12 inches of grade. Fiber cement wicks water like a sponge if the bottom edge sits too close to pavers or concrete. By the time you see surface swelling, the back side is usually worse.
Before
AfterReplacement Cost & What’s Included
For Pomona properties, here’s how the numbers break down when we’re addressing the Hardie-to-hardscape transition:
| Service | Price Range |
| Hardie trim/drip edge replacement (linear ft.) | $18-$34 |
| Paver driveway section repair (localized, up to 100 sq. ft.) | $1,200-$3,400 |
| Full paver driveway replacement | $7,000-$18,000 |
| Concrete driveway replacement | $4,500-$12,000 |
| Driveway sealing (maintenance) | $250-$700 |
The spread depends on three things: how far the water damage has traveled behind the Hardie, whether the original base was compacted to 95% standard Proctor (it rarely was in Pomona’s 1980s-2000s builds), and whether we need to match discontinued paver colors. Under Clause 1 of the Haven Standard, the price we write is the price you pay; no change order gets signed unless you initiate it. Every job includes a documented photo record of the substrate condition before we cover it, and our 365-Day Done Right Promise covers both materials and workmanship.
DIY or Call Us?

There’s honest work a homeowner can do here and work that belongs to a crew. You can safely check your Hardie clearance to grade with a tape measure, clear weep holes at the foundation, and re-sand paver joints with polymeric sand if the base is still sound. Where DIY goes wrong is in assuming the trim piece you see is the only problem. Water behind Hardie siding travels laterally; we’ve opened walls in Pomona where the damage started at the driveway and ran eight feet up the stud bay. Removing fiber-cement board without respirators and HEPA extraction also exposes you to crystalline silica, which OSHA regulates for a reason. If you’re seeing more than one symptom from the list above, or if the Hardie board feels soft at the bottom edge, call (626) 606-1081. We’ll give you a written scope and price before anyone picks up a tool.
FAQs
Properly installed pavers on a compacted base with edge restraints should last 25-30 years in Pomona’s climate. The weak point is almost always the joint sand, which our Santa Ana winds and occasional hard rains deplete faster than in coastal zones. Call (626) 606-1081 for an exact quote on re-sanding and sealing - estimates are free.
If the fiber-cement board itself is sound and only the metal trim is corroded, we can often replace just the drip edge and sealant. Once the board edge has swelled or delaminated, partial replacement is the only repair that holds. We stock both Hardie and compatible aftermarket trim on our trucks for same-day starts.
Most residential jobs in Pomona run 3-5 days: one day for demolition and substrate prep, one for base compaction and grading, two for paver laying and cutting, and a final day for joint sand, sealing, and Hardie trim detail work. We don’t rush the base; that’s where the 10-year failures start.
We carry Hardie-compatible drip edges, termination trims, sealants, and fasteners matched to the HZ10 climate zone that covers Pomona. For full siding replacement or discontinued color matches, we pull from the regional distributor in Rancho Cucamonga, usually next-day. Call (626) 606-1081 to confirm stock for your specific trim profile.
Ready to stop guessing at what’s failing where your driveway meets your house? Call (626) 606-1081 to schedule your free estimate. We’ll bring the tape measure, the photo documentation, and a written price before any work starts - that’s Clause 1 of the Haven Standard, and it’s been our practice since 2007.
Written by Grant Rowan, Owner, Rowan Construction Group Pomona at Rowan Construction Group Pomona, serving Pomona and nearby areas.







Before
After
Before
After
Before
After