A Rowan company - serving Pomona, CA

Cabinet Installation & Refacing in Pomona, CA

Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

Your dream remodel for as low as $199/month*on approved credit; ask for current terms
Styles & brands we work with

Kitchen remodeling
Kitchen remodeling
Bathroom remodeling
Bathroom remodeling
Home additions & ADU
Home additions & ADU
Roofing
Roofing
Windows & doors
Windows & doors
Driveway & pavers
Driveway & pavers
Fence
Fence

Before & after – our own jobs

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Cabinet Installation & Refacing in Pomona, CA

Cabinets & Countertops installation and refacing in Pomona, CA typically costs between $1,800 and $18,000 depending on whether you’re replacing boxes entirely or updating doors and veneer on existing frames. Most projects in the Pomona area are completed within three to seven business days. Rowan Construction Group delivers a flat written price before any work starts – no “call for a quote,” no surprises when the invoice arrives.

If your kitchen feels dated but the layout actually works for you, Kitchen Design & Layout considerations aside, cabinets are usually the single highest-impact change you can make. New doors and hardware on solid existing boxes can shift the entire feel of a kitchen in Diamond Bar-adjacent neighborhoods where tract-home kitchens from the 1980s and 1990s are still the norm. And if the boxes themselves are failing – soft floors inside the cabinet, hinges pulling from the wall, carcasses that sag – full installation is the right call, not a cosmetic fix on a structural problem.

Our Kitchen Remodeling in Pomona work covers everything from tile and countertops to layout changes and plumbing rough-ins. Cabinet installation and refacing sits at the center of most of those projects – and this page explains exactly what it costs, how we do it, and what you’ll have in writing before we touch a single screw.

Questions before you read further? Call us at (626) 606-1081. A live person answers, any time of day.

When You Need Cabinet Installation & Refacing

  • Your cabinet boxes are structurally sound but the doors are dated or damaged. Pomona’s older stock – particularly homes built between 1975 and 1995 in the Ganesha Hills and Westmont areas – frequently has solid plywood boxes behind oak-veneer doors that are warped, delaminating, or simply thirty years out of style. Refacing replaces the visible surfaces and hardware while keeping the bones in place.
  • Water damage has softened the cabinet floor or side panels. Under-sink cabinets in Pomona kitchens see this regularly; the city’s hard water and older supply lines are a reliable combination for slow leaks that go unnoticed. If the damage is isolated, targeted box replacement is faster and less expensive than a full kitchen gut.
  • You’re adding a kitchen island or reconfiguring storage after opening a wall. New construction in Pomona occasionally removes a load-bearing wall between the kitchen and dining area, which orphans the original cabinet run. New installation coordinates the box layout with the updated floor plan rather than working around it.
  • The current cabinet count doesn’t match how you actually use the kitchen. A family in the Palomares Hills zip codes with a smaller original kitchen footprint often needs deeper upper cabinets or a pantry tower added to the existing run – a hybrid job that combines new installation with refacing of the untouched sections.
  • You’re preparing to sell and want the kitchen to photograph well without a full remodel budget. Refacing with updated shaker-style doors and brushed-nickel hardware is one of the most cost-efficient pre-sale moves in the Pomona market, where comparable-home kitchen condition is frequently the gap between a list-price offer and a negotiated discount.
  • Your current cabinets have no soft-close hardware and the hinges are failing. Hinge replacement alone is a minor repair. But if the face frames are also loose, the drawers are off-track, and the veneer is lifting, that’s a refacing candidate – not a hardware swap.

Our Cabinet Installation & Refacing Process

Professional contractor installing custom quartz kitchen countertop during home remodeling project
Our Cabinet Installation & Refacing Process
  1. On-site measurement and written scope. Grant Rowan or a senior project lead comes to your Pomona home, measures every cabinet run, photographs the existing condition, and documents substrate quality – meaning we note whether the current boxes are plywood, particleboard, or MDF, and whether the wall studs behind them are sound. That documentation goes into the written quote, not into memory. Under Clause 1 of the Haven Standard, the price is written before anyone starts.
  2. Material selection with honest lead times. We source KraftMaid and Wellborn cabinets for full installation projects – both lines give us specific door profiles, box depths, and finish options that are quoted by SKU, not by category. For refacing, we match door material and veneer to the rest of the kitchen so the seam between refaced and untouched sections isn’t visible. We name the product on the quote and we name the lead time, because Pomona permit pulls and material delivery both affect your project calendar.
  3. Permit coordination where required. Full cabinet installation that involves electrical relocation for under-cabinet lighting or any structural change to the wall behind the run requires a City of Pomona building permit. We handle the application and schedule the inspection; you don’t manage that paperwork. Refacing on existing boxes with no structural or electrical change typically doesn’t require a permit, and we confirm that in writing before the project starts.
  4. Demolition and substrate prep. For full installation, existing cabinets come down carefully – we protect countertops and flooring that are staying in place and document the wall condition before anything new goes up. For refacing, we clean and lightly sand face frames, confirm the box is plumb and level, and address any soft spots before the new veneer goes on. A refaced cabinet on a soft box is a callback waiting to happen; we document the substrate condition in photos so you can see exactly what we found.
  5. Installation, alignment, and hardware fitting. New boxes go in level and plumb, shimmed to the wall framing – not to drywall alone. Doors are hung, adjusted, and soft-close mechanisms confirmed. Drawer slides are tested with weight before we call a drawer finished. For refacing, new veneer is bonded to face frames and doors are hung with fresh hinges; we don’t reuse old hardware on new doors because the hole patterns rarely align precisely enough to look right.
  6. Photo documentation and walkthrough. Every visit ends with a documented photo record – included as standard, not as an upgrade. At project close, we walk you through the completed work, confirm every door and drawer operates correctly, and hand you the written warranty. If anything isn’t right, the 365-Day Done Right Promise is in writing: Rowan makes it right, backed by the Haven Standard.
BeforeBefore
AfterAfter

Cabinet Installation & Refacing Pricing in Pomona

Cabinet refacing in Pomona typically runs $1,800 to $6,500 for an average kitchen. Full cabinet installation – new boxes, doors, hardware, and interior fittings – typically runs $5,500 to $18,000 for a standard single-wall or L-shaped kitchen layout. Larger or more complex kitchens with island cabinetry, pantry towers, or specialty inserts can go higher, and that’s reflected in the Full Kitchen Remodeling written quote, not discovered at project end.

Scope Typical Pomona Range What Drives the Number
Refacing only (doors, veneer, hardware) $1,800 – $6,500 Linear footage, door profile, material grade
Partial new installation (1-2 new cabinet runs) $3,200 – $8,000 Box count, interior fittings, finish level
Full kitchen cabinet installation $5,500 – $18,000 Layout complexity, brand/line selected, permit needs
Island cabinetry addition $1,400 – $4,500 Box count, countertop overhang, electrical coordination
Soft-close hardware upgrade (existing cabinets) $350 – $900 Number of doors and drawers, hinge type

What affects cost in Pomona specifically

Pomona’s housing stock is older than the regional average. Many homes in the south Pomona corridor and around the Cal Poly campus were built on slab foundations with kitchens that weren’t originally designed around modern appliance depths. Standard 24-inch-deep base cabinets sometimes require shimming or a filler strip to work with 30-inch-wide ranges that owners have upgraded over time. That’s a $150 to $400 adjustment that shows up on the written quote – not as a surprise when the installer is already on site.

Material delivery also affects cost. KraftMaid semi-custom lead times from the Pomona area typically run two to four weeks; Wellborn can be similar depending on the door style selected. Stock cabinets from a local supplier can be on site in days but offer fewer box dimensions and finish options. We name the source and the lead time in the quote so you can make an informed decision about timeline versus customization.

Every estimate from Rowan Construction Group is a flat written price with a written scope. Bring us a competitor’s written estimate and we’ll review it line by line at no charge – the Free Second Opinion offer is standing, with no obligation to hire us after the review.

To get a number specific to your kitchen, call (626) 606-1081. Estimates are free and delivered in writing.

FAQs – Cabinet Installation & Refacing in Pomona

Two contractors installing wooden upper kitchen cabinets with a cabinet jack
FAQs – Cabinet Installation & Refacing in Pomona

How much does cabinet refacing cost in Pomona, CA?

Cabinet refacing in Pomona typically costs $1,800 to $6,500 for an average kitchen, depending on the number of doors, the material selected for the new veneer, and whether the existing face frames need repairs before the new surfaces go on. Kitchens with more than twenty door and drawer fronts or with specialty finishes will land closer to the top of that range. Call (626) 606-1081 for a written estimate specific to your kitchen – the number is delivered before any work starts.

Is refacing or full replacement a better investment in Pomona?

Refacing is the right choice when the existing cabinet boxes are plywood or solid wood and are structurally sound – level, plumb, no soft spots, no significant water damage. Full replacement makes more sense when the boxes are particleboard that has swelled from moisture, when the layout needs to change, or when the boxes are so far out of plumb that a reface would leave the new doors visibly crooked. During the on-site measurement visit, we document the box condition in photos and give you an honest read on which path makes sense before we quote either one.

Do I need a permit for cabinet work in Pomona?

Refacing existing cabinets – replacing doors, veneer, and hardware on existing boxes with no structural or electrical changes – does not typically require a City of Pomona building permit. Full cabinet installation that involves relocating electrical outlets, adding under-cabinet lighting circuits, or changing a wall configuration does require a permit, and Rowan handles the application and inspection scheduling. We confirm the permit requirement in writing as part of the scope before any work starts.

How long does cabinet installation or refacing take in Pomona?

Refacing an average Pomona kitchen takes two to four days on site, assuming materials are on hand. Full cabinet installation typically runs three to seven business days depending on kitchen size, permit inspection scheduling, and whether countertop installation follows immediately after. Material lead time – two to four weeks for semi-custom lines like KraftMaid or Wellborn – is the longer variable, and we document it in the project timeline so you’re not waiting without a clear date. The project calendar is written into the scope before work starts.

Can Rowan match new cabinets to existing ones I’m keeping?

Yes, and this is a common request in Pomona kitchens where one wall is being updated and the rest is staying put. We select door profiles, veneer materials, and finish tones from the KraftMaid and Wellborn lines to match or deliberately complement the existing run. A perfect match isn’t always achievable with older discontinued finishes, and when it isn’t, we say so in the quote and show you the closest available option – not after installation, before. The documented photo record from the site visit gives you a clear before-and-after reference.

Get the price in writing before anything starts.A real person answers, day or night.
Call now

Key Takeaways

  • Refacing costs $1,800 to $6,500 for most Pomona kitchens; full installation runs $5,500 to $18,000.
  • The written price comes before any work starts – this is Clause 1 of the Haven Standard, not a process preference.
  • No change proceeds without a signed change order; that discipline has kept Rowan projects within a few percent of the agreed price across 4,000-plus jobs since 2007.
  • Pomona’s older housing stock often requires minor substrate adjustments that show up in the quote, not in a change order surprise.
  • Cabinet refacing without electrical or structural changes typically doesn’t require a City of Pomona permit; full installation that involves electrical work does, and Rowan handles the filing.
  • The 365-Day Done Right Promise covers completed work in writing. If it’s not right, Rowan makes it right.
  • Bring a competitor’s written estimate and we’ll review it line by line at no charge – the Free Second Opinion is a standing offer.

Start with a Written Price

Contractors installing custom wooden kitchen cabinets during a home renovation.
Start with a Written Price

If your Pomona Kitchen Remodeling project involves cabinets that are dated, damaged, or just not working for how you use the space, the first step is a site visit and a number in writing. Rowan Construction Group has delivered over 4,000 projects since 2007, every one with a flat written price and a documented record when the crew left. We source KraftMaid and Wellborn for cabinet installation because both lines give us specific SKUs to quote honestly, and we reface with veneer and door materials selected to match what’s staying in your kitchen.

Our full scope of kitchen work – countertops, tile, plumbing coordination, and layout changes – is covered on our Kitchen Remodeling in Pomona page if you’re considering a broader update alongside the cabinet work. And if you’d like to understand more about what Rowan Construction Group does across all seven of our trades, the home page is the right place to start.

Call (626) 606-1081 to schedule a free on-site estimate. A live person answers the phone. The written price comes before anyone picks up a tool.

Written by Grant Rowan, Owner at Rowan Construction Group Pomona, serving Pomona.

Need Construction help in Pomona? Licensed & insured · Written quotes before work starts response · free estimates
Call (626) 606-1081
Local Service Coverage

Request a Free Estimate in Pomona

Tell us what you need - Rowan Construction Group Pomona responds fast. No obligation.

When you send us your details, you agree to our Privacy Policy and agree that you may be contacted by phone, text, or email regarding your project, including by the service partners who may complete the work.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch